Search scope:
排序: Display mode:
Hu Ya’an,Zhang Ruikai,Li Yun
Strategic Study of CAE 2009, Volume 11, Issue 9, Pages 52-58
Keywords: TGP lock operational mode prototype debugging
Innovation of Management and Science and Technology in Phase I Construction of TGP
Dai Huichao,Cao Guangjing
Strategic Study of CAE 2005, Volume 7, Issue 1, Pages 50-59
The Three Gorges Project (TGP) has the characteristic of engineering largeness and technology complexityThe Phase Ⅱ construction of TGP, in terms of storing water, navigation and power generation, has beenBreakthroughs have been made in a number of key technology problems, such as the TGP general layout and
Keywords: Three Gorges dam hydropower station ship lock generating set river closure management
Nazim Abdul NARIMAN
Frontiers of Structural and Civil Engineering 2016, Volume 10, Issue 4, Pages 363-384 doi: 10.1007/s11709-016-0353-y
Keywords: vortex-induced vibration fluid-structure interaction Strouhal number lock-in kinetic energy
Phase Ⅲ RCC Cofferdam Construction of TGP
Zhang Shuguang
Strategic Study of CAE 2003, Volume 5, Issue 11, Pages 79-81
The phase Ⅲ RCC cofferdam construction belongs to the phase Ⅲ diversion works. It is a key item to ensure achievement of the reservoir impoundment, navigation and power generation in 2003 and the guarantee to the safety construction of the follow-up right-bank intake dam section and the powerhouse. Restrained by navigation while construction, the construction site and duration, both the concreting intensity and the rise height of the phase Ⅲ RCC cofferdam exceed the current construction level. In view of these difficulties, a huge amount of research work has been performed by relevant departments and is described in the paper.
Keywords: TGP RCC cofferdam concrete
The practice of project construction and management of Three Gorges shiplock
Fan Qixiang,Yang Zongli,Liu Gang
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 91-95
The double-line five-step ship-lock of Three Gorges Project is an extra-largeThe ship-lock is a challenging and world-class project integrating the advanced techniques and equipmentThrough 17-year construction and 9-year operation of the ship-lock, various difficulties in design, constructionsummarized according to the management practice of the second stage main works of Three Gorges ship-lock
Keywords: project management Three Gorges Project ship-lock
Practice and Experimental Verification of TGP’s Permanent Shiplock Slope
Zhang Chaoran
Strategic Study of CAE 2001, Volume 3, Issue 5, Pages 22-27
The high slope for the permanent shiplock of the Three Gorges Project (TGP), excavated from the mountain
Keywords: TGP permanent shiplock high slope
The design of double line five step ship-lock of Three Gorges Project
Niu Xingqiang,Tong Di,Song Weibang
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 85-90
The general design and layout of the double line five step ship lock, the water delivery technique for high head ship lock, the key technical problems of fully lined ship-lockmiter gates and hoisting equipment under complicated operation conditions of the Three Gorges Project (TGPSince the operation of ship lock in 2003, the operation practice has proved that the design techniquespractice of ship lock projects, which makes the construction technology of ship lock in the world reach
Keywords: Three Gorges Project double-line five-step design of ship-lock
The Generating Lock P<G,X,X'>and Its Central Encrypting System
Shi Kaiquan,Chen Zexiong
Strategic Study of CAE 2000, Volume 2, Issue 2, Pages 41-46
The conception of the generating lock P <G ,X, X´> and the centralThese systems include the generating lock P<G ,X, X´> and single-tooth central encryptingsystem, and the generating lock P <G ,X, X´> and multi-tooth central encrypting
Keywords:
the generating lock
the central encrypting system
multi-tooth encrypting-decrypting algorithm
P
Frontiers of Agricultural Science and Engineering 2021, Volume 8, Issue 3, Pages 474-480 doi: 10.15302/J-FASE-2021406
European cropping systems are often characterized by short rotations or even monocropping, leading to environmental issues such as soil degradation, water eutrophication, and air pollution including greenhouse gas emissions, that contribute to climate change and biodiversity loss. The use of diversification practices (i.e., intercropping, multiple cropping including cover cropping and rotation extension), may help enhance agrobiodiversity and deliver ecosystem services while developing new value chains. Despite its benefits, crop diversification is hindered by various technical, organizational, and institutional barriers along value chains (input industries, farms, trading and processing industries, retailers, and consumers) and within sociotechnical systems (policy, research, education, regulation and advisory). Six EU-funded research projects have joined forces to boost crop diversification by creating the European Crop Diversification Cluster (CDC). This Cluster aggregates research, innovation, commercial and citizen-focused partnerships to identify and remove barriers across the agrifood system and thus enables the uptake of diversification measures by all European value-chain stakeholders. The CDC will produce a typology of barriers, develop tools to accompany actors in their transition, harmonize the use of multicriteria assessment indicators, prepare policy recommendations and pave the way for a long-term network on crop diversification.
Keywords: crop rotation lock-in intercropping multiple cropping networking
Dai Huichao,Peng Peng
Strategic Study of CAE 2004, Volume 6, Issue 2, Pages 33-37
Keywords: TGP penstock spiral case
Major Difficult Problems in the Construction of the Three Gorges Project
Wang Jiazhu
Strategic Study of CAE 2003, Volume 5, Issue 8, Pages 16-22
As the largest in the world by far,the Three Gorges Project (TGP )is a multipurpose development and
Keywords: TGP science and technology difficult problems
Lin Bingnan,Zhou Jianjun
Strategic Study of CAE 2004, Volume 6, Issue 4, Pages 30-33
Keywords: sediment management reservoir suspended load deposition flood stage
Practice and Quest of Quality Control in Three Gorges Project
Wang Jiazhu,Xu Changyi
Strategic Study of CAE 2001, Volume 3, Issue 10, Pages 77-81
The Three Gorges Project (TGP) is a vitally important and backbone project in the development andBased on a detailed introdution of the TGP quality assurece and quality control, the paper give some
Keywords: Three Gorges Project (TGP) quality assurece quality control
Dam Concrete Placement by Towerbelt
Peng Gang
Strategic Study of CAE 2004, Volume 6, Issue 9, Pages 77-80
Keywords: TGP towerbelfs pouring concrete
Technical Breakthroughs in the Construction of TGP
Zhang Chaoran,Dai Huichao
Strategic Study of CAE 2003, Volume 5, Issue 2, Pages 20-25
The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made on the issues such as river closure of the Grand Channel and concrete construction of the cutoff wall, prompt concrete construction of dam, high slope construction of permanent shiplock, large-scale steel-lined reinforced concrete penstocks of power station and temperature and pressure maintaining of the spiral case, asphalt concrete core wall, metal works of the shiplock, turbine generating units, and so on.
Keywords: Three Gorges Project key technique breakthroughs
Title Author Date Type Operation
Study on four-step operational mode prototype debugging of TGP lock under impounded level 156 m in the
Hu Ya’an,Zhang Ruikai,Li Yun
Journal Article
Innovation of Management and Science and Technology in Phase I Construction of TGP
Dai Huichao,Cao Guangjing
Journal Article
Influence of fluid-structure interaction on vortex induced vibration and lock-in phenomena in long span
Nazim Abdul NARIMAN
Journal Article
The practice of project construction and management of Three Gorges shiplock
Fan Qixiang,Yang Zongli,Liu Gang
Journal Article
Practice and Experimental Verification of TGP’s Permanent Shiplock Slope
Zhang Chaoran
Journal Article
The design of double line five step ship-lock of Three Gorges Project
Niu Xingqiang,Tong Di,Song Weibang
Journal Article
The Generating Lock P<G,X,X'>and Its Central Encrypting System
Shi Kaiquan,Chen Zexiong
Journal Article
ENABLING CROP DIVERSIFICATION TO SUPPORT TRANSITIONS TOWARD MORE SUSTAINABLE EUROPEAN AGRIFOOD SYSTEMS
Journal Article
Selection and Verification of the Structural Pattern of the Penstock and Spiral Case of the TGP Power-station
Dai Huichao,Peng Peng
Journal Article
Major Difficult Problems in the Construction of the Three Gorges Project
Wang Jiazhu
Journal Article
Practice and Quest of Quality Control in Three Gorges Project
Wang Jiazhu,Xu Changyi
Journal Article